Road Crossings

Here’s a map showing the trail’s road crossings — points at which you can access the trail. As more work is done on all sections of trail, it’s getting easier and easier to spot these points, but the map might help you get in the neighborhood.

Posted in Uncategorized | Leave a comment

Action on the Trail

Valentine’s Day 2013

Walking on Houghton Road this morning, we were surprised to see work in progress on the BDT going both north and south!  We happened upon Parks personnel who told us the contractor for the Willow Creek Bridge is doing the trail preparation from Houghton Rd. north to the bridge; and FL Parks is clearing the trail heading south towards Garrett Rd.

New culverts on both sides of the road at the BDT intersection are already in place.

AND check out the completed Glenwood Heights Bridge!

-Jan

Posted in Uncategorized | 4 Comments

We keep looking

We keep visiting the site of the Glenwood Creek bridge to see what progress we can see. Those of us who seek instant gratification are really being tested severely — after the really dramatic arrival of beams and concrete, changes from week to week are small or invisible. Concrete needs to cure for quite a while, a process even less entertaining than drying paint. I’m not sure if the curing process is still going on — there is still a plastic tarp covering the entire bridge, so maybe it still needs some more time. Amanda Zerilli made her way there a few days ago to shoot the picture to the left. I can attest that it’s about the same as what I saw several weeks ago and again on Election Day. Amanda’s photo shows the wooden rails on either side, which are temporary until the permanent railing is added. There are piles of square steel posts that are evidently destined to hold up the railing — you can see rows of bolts sticking out of each side of the concrete where the posts will be bolted in place. That may be the next exciting change we see.

My wife, Diana, and I walked there from Cass Park a couple weeks ago — it was Election Day, we had voted and needed the comforts of the natural world until the decision would be revealed at night. It was full autumn on the trail, with most trees completely bare and golden leaves thick on the ground. Again we saw what a treasure this trail is already for our community and how wonderful it will be when finally opened.

Before getting to Glenwood Heights Road were a couple places where the recent storms had brought down trees. One patch had been cleaned up to a large extent, but the second one was quite an obstacle in our path. We carefully stepped through a gap, branches and vines catching our clothes and hair.

We spent a few minutes looking around the new bridge site as well as the old bridge that still spans the gorge down near the highway. It’s quite a dramatic gorge that plunges down to the lake from that point.

After getting some delicious hot soup at Glenwood Pines, we walked back to Cass Park as the shadows of West Hill got longer. Hopefully, the next time we visit the bridge, there will be railings and perhaps other features of the permanent structure. It’s great to think that this marvelous project will soon take a great step forward.

Posted in Uncategorized | Leave a comment

Accessing the BDT as it is today

Since the last flurry of activity on the part of the Black Diamond Trail Enthusiasts Network, the trail has taken significant steps toward being reality. Large sections of it have been cleared of brush, culverts have been installed to make it accessible to maintenance equipment, culverts along the trail have been repaired or replaced — and, the most dramatic of all, the bridge at Glenwood Creek has been rebuilt. The bridge isn’t ready to use yet, but the foundations are in place and a concrete deck has been poured; we’re actually going to be able to cross the Glenwood Creek gorge on it, probably before the end of this year! All this progress has, just as we predicted, attracted lots of people who want to use the trail, and people are asking for specific information about the location to the trail and how to get access. The official answer is, please wait until the project is finished and signage and other information sources will point clearly to the trail. But, that will take a lot more time — quite certainly past even the 2013 anticipated construction of the next bridge. So, we’ve tried to get some information together to help people use the BDT now. It’s not official and may have inaccuracies — help us out by reporting fresh information and corrections. But, to the best of our knowledge as of 10/18/12, here’s how the trail shapes up.

If you’re new to the BDT, it follows a rail line that used to go through Ithaca and north to Seneca Falls. The part that is being developed is between Ithaca and Taughannock Falls State Park. There are ideas and rumors of extending the trail northward to Trumansburg; and, there are plans to eventually extend this trail to other parks south of Ithaca. But, for now, it’s the Ithaca to Taughannock Falls portion that we are anticipating. The map shows the route of that trail and you can click on “View full route” to get a map that can be enlarged and zoomed to give you as much detail as you need, including accurate distances between road crossings. Note that the trail crosses a number of roads on its way from Cass Park — Glennwood Heights, Perry City, Garrett, Houghton, Kraft, Agard, Willow Creek, and Gorge. When the project is done, you will be able to get on or off the trail at any of these roads. At present, some of the roads make more sense to use as access points than others, and some of the crossings should really not be used as access points at all.

On Thursday, October 18, 2012, I made a quick survey of all the road crossings and tried to get photos of each one to help people who may be searching for access. Here’s what I learned.

Cass Park

This is the easiest place to access the trail and, in many ways, the best. It’s easy because it’s close to Ithaca and there is a parking area that always has room. There are also public rest rooms to use before you embark on your hike or ride.

The BDT is to the west from the parking area — go across the waterfront trail that parallels the driveway, follow the broad gravel path to the foot of the hill, and turn right (north) along the path that runs next to the tall towers carrying NYSEG power lines. You can go about three and a half miles along this trail before hitting Glenwood Heights Rd.  Before that, at about two miles, you pass the driveway leading up to the hospital and the Biggs building. From about this point north, the surface of the trail becomes primarily the coarse stone of the old railroad bed. It’s a bit rough, so wear good shoes and use as fat tires as you can on your bike.

Glenwood Heights Rd

BDT south from Glenwood Heights Rd

North from Glenwood Heights

If you want to start from this point, parking is a bit marginal. There is a place to pull off the road just downhill from the trail on the north side of the road. The trail in both directions from Glenwood Heights Rd has a metal gate across it. Looking south toward Cass Park, you’ll see a gate with a comfortable gap on one side for hikers or cyclists to pass. The trail in this section to Ithaca is clear of all brush and the surface is mainly the coarse rock that used to be railroad bed. It’s fine for walking, but a bit rough on bicycles — for a mountain bike, it would be no trouble, though. The distance to Cass Park is about 3.5 miles.

Northbound from Glennwood Heights Road, is another gate, this one a bit more thorough in blocking access. But, you can go around the right side of the gate without too much trouble and proceed as far as the new bridge construction, just a bit over a tenth of a mile (you can see the construction machinery from the trail at Glennwood Heights Rd). If you want to proceed north on the trail, you can’t yet cross the bridge; however, it is possible to detour around the bridge by going off the trail to the right (east) either down to NY 89 or to an older bridge still in place across the gorge near NY 89. This is also an excellent way to go to Glenwood Pines restaurant — a great dinner hike from Ithaca!

Perry City Road

South from Perry City Rd

North from Perry City

This isn’t a very good place to start if you have a car. There is no plausible parking on Perry City Road. You would probably have to leave your car on NY 89, where there is some parking space along the road just about at the intersection with Perry City Rd.

South from here, the trail looks like someone’s driveway — probably the right-of-way has been used in that way for many years. Nevertheless, it is now the Black Diamond Trail and you can hike on it. Remember, though, that the new bridge construction is still under way and impassable just a quarter mile down the trail in that direction, so you will either have to turn around or find the old detour (head down toward NY 89 and look for the old bridge to cross the gorge).

Northbound from Perry City Rd, the trail is grassy and much less civilized looking. The grass has grown quite tall in the sunny parts, but you can definitely see where the trail begins and ends.

Garrett Rd, Houghton Rd

Houghton north

I need help on these crossings — I got out my GPS-enabled phone maps and looked for signs of the trail when the map said I was right on it. However, I saw nothing at all to indicate a trail on Garrett Rd — just driveways and ordinary yards. I’m told that people have traversed the trail through this section, so it must be here somewhere, but I sure didn’t see where.

On Houghton Rd, I did find what looks like a trail on the north side of the road just below the driveway with the house number 4172. But, while that looked like a trail for sure, opposite it was a driveway with a house number that I’d be pretty sure isn’t a public trail. Possibly it’s similar to the driveway off Perry City Rd., where the right of way was used for private purposes; but, I’ll await knowledgeable instructions on this one. If anyone can help out with these road crossings, please let us know.

Kraft Road

South of Kraft Rd

From Kraft Road, there is no trail toward the south. At the road, you’ll find a broad cleared area, as though used by trucks for loading or the like. Going straight back across this clearing, there is a line of trees and brush and, beyond that, the remains of the old railroad bridge. There is no way to proceed through there — it’s fenced off and the gorge would be too steep and deep to cross on foot anyway. There used to be some signs around that expressed a clear un-welcome to trail seekers, so I’d stay clear of it until the bridge is rebuilt. To the north, there is a normal trail access point, and the trail is pretty much clear all the way to the top of Taughannock Falls State Park, about 2.3 miles away.

Agard Rd

Agard Rd., south

Agard Rd., north

The crossing of Agard Rd has had the most attention along the trail — culverts were installed on each side of the road in order to give access to mowing and other trail maintenance equipment. Unfortunately, it seems that no maintenance has actually taken place since the work parties cleared most of the brush. Today, the trail looks completely overgrown with weeds, to the south of Agard Rd almost unrecognizable as a trail. Nevertheless, the trail is passable with no heavy brush impeding those who are willing to push through.

Willow Creek

Willow Creek Rd., south

Willow Creek Rd., north

The Willow Creek Road crossing is at a narrow angle to the road and doesn’t seem exactly aligned, so it might be a bit difficult to spot. The northbound trail clearly follows a hedgerow that you can easily spot from the road. The southbound trail angles off right next to a driveway on the east side of the road. The northbound section of trail from here is one that the BDT enthusiasts have worked on the longest. It was from Taughannock to this point that the earliest volunteer trail clearing efforts were directed many, many years ago.

Gorge Road

Gorge Rd., south

Gorge Rd., north

The Gorge Road crossing is the last before the trail ends at Taughannock Falls State Park, on the old railroad bridge over the creek. There is no good place to leave a car here; however, just around the corner (west to Jacksonville Rd., then north just a bit to the bridge over the Taughannock creek) there is an excellent parking area and access to a magnificent view of the upper gorge. If you park there, you can hike the trail south by first walking up to the old railway bridge. It’s well worth just visiting the bridge.

Posted in Uncategorized | Leave a comment

Glenwood Creek Bridge Progress

30 Sept 2012

The first layer of surfacing has been laid on the Glenwood Creek bridge, and heavy equipment remains as if poised to continue work next week. It’s not passable yet, but it’s impressive to see the steps in the process.

As of yesterday, work on the second bridge — the Willow Creek bridge (just off Kraft Rd.) — hadn’t yet started.

-Jan

Posted in Uncategorized | Leave a comment

Trail Vista

Bison in pasture next to BDT

From Amanda Zerilli, September 29, 2012:

Took this picture today from the trail at Glenwood Heights Road. I have been commuting on the trail about five days a week going from Tburg to Ithaca. I get on at Glenwood. They were working on the bridge today – Saturday September 29. It looks like it is coming along.

Envoyé de mon iPad

Posted in Uncategorized | Leave a comment

Bridge In!

Girders crossing the gorge at Glennwood

The gorge between Glenwood Heights Rd and Perry City Rd was bridged today!

The steel infrastructure is in place — not passable unless you’re a squirrel, but the framework is mighty impressive, worth a look. How did they transport that length of steel?!?!

Jan

Posted in Uncategorized | Leave a comment

Buldozers!

Suiting actions to words, buldozers and other heavy machinery along with a team of workers have descended upon Glenwood Creek to build a new bridge for the Black Diamond Trail! Beginning even before the official announcements made it known to the world, work has begun to connect the Ithaca end of the trail to the next section extending north to Willow Creek.  The progress after so many years of anticipation has caused a lot of excitement and enthusiasm — at last this  beautiful corridor to Ithaca’s north will become available for everyday use.

Early this week the official announcements were made regarding work on the trail. It seems that the second required bridge has already been planned and put out for bids and that both bridges might actually be completed by early next year. The surfacing of the path is another matter — it makes sense to put a good finish on the trail only once all the culverts and other drainage problems have been resolved. This work has begun to some extent on the southern end of the trail near Ithaca. Perhaps the final surfacing will be applied to those sections first. Completion of the whole trail is still  several years off — but at least this future is foreseeable, unlike the last forty years of the trail’s history.

 

Posted in Uncategorized | Leave a comment

Moving forward

The Ithaca Journal’s May 2 “County Watch” (http://tinyurl.com/85pmw46) includes these bits regarding the BDT:

Construction bidding on the second Black Diamond Trail bridge ended Wednesday. The apparent low bidder for the Willow Creek bridge is Silverline Construction from Burdett, with a bid of $392,718; state regulators still need to approve the bid package. The bridge is to have a concrete deck with timber rails.

Construction on Glenwood Creek bridge, the other half of the trail bridges project, began about two weeks ago with a winning bid of $486,000 from R DeVincentis Construction from Binghamton. The bridge, also with a concrete deck and timber rails, is scheduled for completion in October.

Funding for the projects came from the state and a private bequest.

Posted in Uncategorized | Leave a comment

May 15 Publicity Event Details

From: Tim Joseph, April 30, 2012

In order to accommodate the schedules of various people who should be part of this event, we are planning that it will consist of a report by Commissioner Rose Harvey to the Policy Committee of the Ithaca/Tompkins County Transportation Council (ITCTC) to be held at 2:00 on May 15th at the Ithaca Town Hall, 215 N. Tioga St., in Ithaca.  Public and press are invited.

We will miss the visual impact of doing something on the trail itself, but then, we’ll also avoid the danger of bad weather.

Tim Joseph, Regional Director, Finger Lakes State Parks

Posted in Uncategorized | Leave a comment